Meghri bridge over the river Arax

In 1995 the border bridge between Republic of Armenia and Islamic Republic of Iran was put into operation. Length of the bridge is 207,72m, width- 13.5m (1.0+11.5+1.0). Span construction is metalic (3x63m) with reinforced-concrete traffic part slab. Bridge middle piers foundations are on buried holes. Precast concrete -1440m3 Monolithic concrete- 3630m3 Metallic constructions -600tn Traffic part area-2805m2

Precast concrete

1440m3

Monolithic concrete

3630m3

Metallic constructions

600tn

Traffic part area

2805m2