Meghri bridge over the river Arax
In 1995 the border bridge between Republic of Armenia and Islamic Republic of Iran was put into operation. Length of the bridge is 207,72m, width- 13.5m (1.0+11.5+1.0). Span construction is metalic (3x63m) with reinforced-concrete traffic part slab. Bridge middle piers foundations are on buried holes.
Precast concrete -1440m3
Monolithic concrete- 3630m3
Metallic constructions -600tn
Traffic part area-2805m2