Bridge situated in the 90th km of railway,s Idjevan-Hrazdan section
In 1985 bridge was put into operation. Length of bridge-133m, longitudinal scheme-2x45+27m, with metallic spans.
Length of bridge
133m
longitudinal scheme
2x45+27m