Bridge situated in the 88th km of railway,s Idjevan-Hrazdan section
In the 1985 double-track railway bridge was put into operation. Length of the bridge-182m, longitudinal scheme-3x45+33.6 m, with metallic spans.Height of the piers -up to 40m.
Prescat concrete - 970m3
Monolithic concrete - 6400m3
Metallic construction - 650tn