Bridge situated in the 85th km of railway,s Idjevan-Hrazdan section

In 1985 bridge was put into operation. Length of the bridge-158m.Longitudinal scheme-45+55+45m,with metallic span construction and reinforced concrete ballast slabs. Height of piers-45m. Precast concrete-3800m3 Monolithic concrete - 3800m3 Metallic construction - 350tn

Precast concrete

3800m3

Monolithic concrete

3800m3

Metallic construction

350tn